We design and build warehouses, hangars and factories on leased plots in Dubai Industrial City. Approvals handled, structure fabricated and erected by our own teams, delivered turnkey.
Just signed a lease on a plot in Dubai Industrial City? We take it from empty sand to a finished, approved building. Abu Ali Group is a Dubai design-and-build contractor working since 2003, with our own engineering, fabrication and erection teams — no subcontractors. We design your warehouse, hangar or factory, secure every authority approval, then fabricate and erect the structure, with typical warehouse builds finished 8–10 weeks after approvals. One contract, one team, and a building ready to operate.
Building in Dubai Industrial City means permits through the Dubai Development Authority (TECOM), plus Dubai Civil Defence and DEWA. We prepare the drawings, submit on your behalf and follow every approval through to the building permit — you don't chase a single stamp.
Warehouses, hangars, factories and commercial buildings — as pre-engineered buildings (PEB), hot-rolled steel or cold-formed steel. We recommend the system that fits your operation and budget, then engineer and fabricate it in-house.
One sequence: design, authority approvals, fabrication in our facility, erection on your plot, then testing and handover. Once approvals are issued, a typical warehouse is built in 8–10 weeks — and you deal with one team throughout.
Abu Ali Group has delivered more than 200 industrial structures and 150+ villas, with in-house engineering, fabrication and erection teams — no subcontractors. We build from our base in Al Quoz 3, Dubai, and our engineers are on your plot in Dubai Industrial City whenever needed.
Share your plot number and requirements — we reply with a budgetary estimate and timeline within 48 hours.