Dubai Industrial City is a TECOM Group district; plots are leased for industrial use, with building approvals through the Dubai Development Authority and Dubai Civil Defence.

Your plot in Dubai Industrial City. Built and handed over.

We design and build warehouses, hangars and factories on leased plots in Dubai Industrial City. Approvals handled, structure fabricated and erected by our own teams, delivered turnkey.

Build in Dubai Industrial City

From leased plot to operating facility.

Just signed a lease on a plot in Dubai Industrial City? We take it from empty sand to a finished, approved building. Abu Ali Group is a Dubai design-and-build contractor working since 2003, with our own engineering, fabrication and erection teams — no subcontractors. We design your warehouse, hangar or factory, secure every authority approval, then fabricate and erect the structure, with typical warehouse builds finished 8–10 weeks after approvals. One contract, one team, and a building ready to operate.

01

Approvals handled, start to finish

Building in Dubai Industrial City means permits through the Dubai Development Authority (TECOM), plus Dubai Civil Defence and DEWA. We prepare the drawings, submit on your behalf and follow every approval through to the building permit — you don't chase a single stamp.

02

PEB, hot-rolled and cold-formed steel

Warehouses, hangars, factories and commercial buildings — as pre-engineered buildings (PEB), hot-rolled steel or cold-formed steel. We recommend the system that fits your operation and budget, then engineer and fabricate it in-house.

03

Design to handover in clear stages

One sequence: design, authority approvals, fabrication in our facility, erection on your plot, then testing and handover. Once approvals are issued, a typical warehouse is built in 8–10 weeks — and you deal with one team throughout.

04

A Dubai contractor since 2003

Abu Ali Group has delivered more than 200 industrial structures and 150+ villas, with in-house engineering, fabrication and erection teams — no subcontractors. We build from our base in Al Quoz 3, Dubai, and our engineers are on your plot in Dubai Industrial City whenever needed.

Common Questions
Can you handle the approvals for a plot leased in Dubai Industrial City?
Yes. We manage the full approvals cycle for leased plots in Dubai Industrial City — design submissions to the Dubai Development Authority (TECOM), Dubai Civil Defence fire approvals and DEWA connections — through to the building permit and completion. You sign the lease; we handle the paperwork.
How long until my warehouse in Dubai Industrial City is ready?
Design and approvals timelines vary by project, but once approvals are issued we typically build a warehouse in 8–10 weeks. Because engineering, fabrication and erection are all in-house, there are no subcontractor delays between stages.

Send us your plot details today.

Share your plot number and requirements — we reply with a budgetary estimate and timeline within 48 hours.

WhatsApp Your Plot Details Call +971 50 451 4266