Dubai Industrial City is a TECOM Group district; plots are leased for industrial use, with building approvals through the Dubai Development Authority and Dubai Civil Defence. Leases carry development timelines, so the sooner work starts on site, the safer your plot.

Your plot in Dubai Industrial City. One contractor, no tender cycle.

Abu Ali Group designs and builds warehouses, hangars and factories in Dubai Industrial City — from design and approvals to site mobilisation in 40 days, because you appoint us directly instead of running a consultant and tender cycle.

Build in Dubai Industrial City

From leased plot to operating facility.

Just signed a lease on a plot in Dubai Industrial City? The usual route is to appoint a consultant, wait for a design, float a tender, evaluate bids and award — months before anyone touches your plot. We remove that entire cycle. Abu Ali Group is appointed directly as your design-and-build main contractor: one contract covering design, Dubai Development Authority and Civil Defence approvals, and construction. That is how we move from design and approvals to site mobilisation in 40 days. Construction then follows on a programme agreed with you in writing — but the important part is that the work starts, and your plot is visibly under development.

01

No consultant, no tender, no award delay

You do not need to appoint a consultant, prepare tender documents, evaluate bids and award a contract. You appoint one main contractor directly, and design starts the same week. That single decision is what removes months from the front of the project.

02

One contract: design, approvals, construction

Permits in Dubai Industrial City go through the Dubai Development Authority (TECOM), with Dubai Civil Defence and DEWA alongside. We prepare the drawings, submit on your behalf and follow each approval through to the building permit — one main contractor answerable for all of it.

03

From design and approvals to site in 40 days

One sequence, no handovers between parties: design, authority approvals, then mobilisation on your plot within 40 days. Construction continues from there on an agreed programme, and you deal with the same team from the first meeting to handover.

04

A licensed Dubai contractor since 1976

Abu Ali Group has been a licensed Dubai contractor since 1976 (DED licence 101098), incorporated as Abu Ali Contracting LLC in 2003, with 500+ projects delivered. We build from our base in Al Quoz 3, and our engineers reach your Dubai Industrial City plot whenever the project needs them.

Common Questions
Do I need a consultant and a tender before building in Dubai Industrial City?
No. You appoint us directly as design-and-build main contractor, so there is no consultant appointment, no tender document, no bid evaluation and no award cycle. We design the building, submit to the Dubai Development Authority (TECOM), Civil Defence and DEWA, and take responsibility for construction under one contract.
What exactly happens in the 40 days?
The 40 days cover design, authority submissions and getting our teams and equipment established on your plot — mobilisation on site, not a finished building. Construction of the building runs after that, on a programme we agree with you in writing before signing.

Send us your plot details today.

Share your plot number and requirements — we reply with a budgetary estimate and timeline within 48 hours.

WhatsApp Your Plot Details Call +971 50 451 4266
Prequalification & Current Projects — Download PDF