Established Dubai mainland industrial district — plots are leased for industrial and commercial use, with building approvals through Dubai Municipality and Dubai Civil Defence.

Your plot in Al Quoz Industrial. Built by the contractor down the road.

Abu Ali Group designs and builds warehouses, hangars and factories on plots across Al Quoz Industrial — new builds, extensions and renovations. We handle Dubai Municipality and Civil Defence approvals and hand over turnkey, from our own base in Al Quoz 3.

Build in Al Quoz Industrial

From leased plot to operating facility.

If you have just taken a plot in Al Quoz Industrial, you are building in our home district. Abu Ali Group has been a design-and-build contractor in Dubai since 2003, and our base is right here in Al Quoz 3. We take your project from concept drawings through Dubai Municipality and Civil Defence approvals to fabrication, erection and handover — all with our own engineers and crews, no subcontractors. New warehouse, extension to an existing facility, or re-cladding an older shed: a typical build takes 8–10 weeks once approvals are in.

01

Approvals handled, start to finish

Building in Al Quoz Industrial means permits from Dubai Municipality, fire-safety approval from Dubai Civil Defence and a DEWA connection. We prepare, submit and follow up on all of it — drawings, NOCs and inspections — so you never have to chase a stamp yourself.

02

Every steel system, one contractor

PEB pre-engineered buildings, hot-rolled structural steel and cold-formed steel — warehouses, hangars, factories and commercial buildings. We design, fabricate and erect all of them in-house, and we also extend, renovate and re-clad older Al Quoz warehouses.

03

From drawings to handover in clear steps

Design, then authority approvals, then fabrication in our own facility, then erection on your plot, then handover. Once approvals are issued, a typical warehouse is delivered in 8–10 weeks — with one team accountable for every step.

04

Your contractor is already in Al Quoz

Design-and-build in Dubai since 2003, with 200+ industrial structures and 150+ villas delivered. Engineering, fabrication and erection are all in-house — no subcontractors — and our base in Al Quoz 3 puts us minutes from your site.

Common Questions
Can you handle Dubai Municipality and Civil Defence approvals for my plot in Al Quoz?
Yes. We manage the full approval cycle for Al Quoz Industrial projects — Dubai Municipality building permits, Dubai Civil Defence fire-safety approval and the DEWA connection — including drawings, submissions and inspections, whether it is a new build, an extension or a renovation of an existing warehouse.
How long until my warehouse in Al Quoz is ready?
Once authority approvals are issued, a typical warehouse takes 8–10 weeks to build and hand over. Because our engineering, fabrication and erection teams are all in-house — and based in Al Quoz 3 — there are no subcontractor delays in between.

Send us your plot details today.

Share your plot number and requirements — we reply with a budgetary estimate and timeline within 48 hours.

WhatsApp Your Plot Details Call +971 50 451 4266